Vision inspection gate: the right part, hung the right way.
The gate recognizes each part, checks how it is hung and positioned before the process and stops the line on any deviation. It talks directly to the conveyor PLC.
Before the process, not after.
Part recognition
The camera identifies the reference of every passing part, with several references on the same line.
Hanging and position
Hanging and position checked before treatment, where a single error costs a whole run.
Line stop and alert
On any deviation, the gate stops the line and alerts the operator. Every check is logged with its image.
Complete gate
Frame, electrical cabinet, lighting, guarding and program: we deliver the gate ready to install.
From your samples to commissioning.
Sample testing
You send photos, codes or parts. We prove the reading or detection before any commitment.
measured test resultsDesign
Optics, lighting, mechanics, PLC, software and connections. Vision succeeds or fails on lighting and integration.
machine design file + quoteBuild
Station or machine assembled and tested in our workshop in the Var, with your parts.
machine tested in the workshopCommissioning
On-site installation, PLC and MES connection, operator training, start-up support.
machine in production
Batch to re-inspect, relabeling? Temporary verification station.
Complaint, recall, doubtful codes: we install a temporary reading and verification station to re-inspect your products while the permanent solution is being built.
Vision, plus the machine around it.
A vision system is only useful once integrated: conveying, rejection, PLC, serialization software, operator interface. Our workshop builds the complete station, not just the camera program. Software and mechanics under one roof.
Your questions
Do we need to stop the line for installation?
The gate is assembled and tested in our workshop. On-site work is scheduled during your production stops.
Does the gate handle several references?
Yes. A new reference is added by adjusting the program, without modifying the machine.
Which PLC?
Siemens over Profinet, Ethernet/IP, OPC UA or simple digital I/O, depending on your installation.
How much does it cost?
It depends on the number of references, the line speed and the mechanical integration. You receive a quote within 5 days of describing your line.
Describe your line.
Parts, references, line speed, PLC: feasibility study and quote within 5 days.